Showing posts with label mid-year report. Show all posts
Showing posts with label mid-year report. Show all posts

Monday, June 28, 2010

Mid-Year Review

Time to see how I'm doing on my goals for this year.  Some areas I'm doing good in, but there is room for improvement in others.  All-in-all the year has been going pretty good so far.

Stashbusting Goals:
  • Use at least 150 yards of stash - so far I've used 61.50 yards.  I don't think I'll make 150, but it's feasible to get 100 yards.
  • Keep buying to a minimum. - Fabric buying has been kept to a minimum, but I've bought way too much yarn!
  • Add less yardage than I use; does not include BOMs (Cobblestone Lane and Vintage Memories).  - So far I've added 35.75 yards.  It's not a lot less than what I've used, but it IS less.
  • Items on my “want list”:
    • Judy L’s Weekend Quilts - Bought
    • Judy Martin’s Stellar Quilts – Bought
    • Looking Back FQ bundle – Bought
    • Pure FQ bundle - adding for 2nd half
    • Lollipop (maybe jelly roll or layer cake) - adding for 2nd half
    • Park Avenue - adding for 2nd half
    • Paris in the Fall quilt kit - adding for 2nd half - already pre-ordered
  • Move out enough fabric in closet/cabinet so I can move fabric from under sewing table in. - One pile has been moved to the closet and cabinet.  There is one rubbermaid and a lot of FQ bundles still under the sewing table.
  • Re-fold fabric to better utilize room in closet/cabinet. – Cabinet done.  I still need to tackle the closet.
  • Quilt/Finish 13 quilts (particularly tops made prior to 2010) - Five quilts are complete, as well as 7 pillowcases.  At the beginning of the year my goal was to quilt a top every month.  I decided I'd rather concentrate more on finishing WIPs and starting new projects during the summer so I'll get back to quilting flimsies in the fall/winter.
  • Make at least 1 donation quilt a month. - With my slow progress on tops, I think this was a little unrealistic, but I am currently working on a QOV and think I'll be donating Grape Jam also.
  • Work on at least 3 kits/PIGS (projects in grocery sacks). - I am currently finishing up Grape Jam.  I need to focus more on this during the second half of the year to help clean out the closet more.
  • Make more quilts from books/patterns that I have, particularly: - I've been doing pretty good on this, although all of them items below are individual patterns.  I need to use some book patterns in the second half.  
    • Morning Splash (Judy LaQuidara’s QAL) - currently working on the borders
    • Jelly & Jam pattern - need to add the final border
    • Birdseye pattern - flimsie finished
    • Claire handbag pattern - working on the lining 
  • Make more “simple” and quick quilts (they don’t all have to be complex) - I think this would help me use up stash and fulfill the donation quilts; so need to think about some small quilts
  • Make table runner (home) and wallhanging (work) for Valentine’s Day, St. Patrick’s Day, and Easter/spring - I made a Valentine's Day wallhanging
  • Learned how to do mitered corners – He Loves My Daisies. 
  • Continue learning how to knit. - Finish two sweaters and two pair of socks
  • Make pair of socks – Completed two pair
  • Finish veetee sweater – Done 1/25/10 
  • Only buy yarn for a specific project….no room for a yarn stash!! - Failed miserably, but I'm trying to keep it in check now.  At least the majority of the yarn was bought for a specific project...now I just need to figure out how to knit faster to use some of it up!  LYS has a sale in July that I want to check out, otherwise I need to stay away!
 Personal Goals:

  • Continue exercising every day and eating right - I need to improve, especially eating smaller portions again.
  • Keep my a1c down to under 5.9 - May result: 5.6!!! 
  • Participate in the CellCom Mini Marathon (2.62 miles) at Lambeau Field - finished in 33 min 45 sec
  • Go through the boxes (at least 1 a month) in the basement and consolidate or donate/throw out what I don’t want. - I've pulled some things out for donation, but it hasn't been monthly.  Vacation is coming up and hopefully can work on this more.

Sunday, June 27, 2010

Week 26 Stash Report

More progress was made this week, especially on the Memorial Day QOV.  I did not like the fabric I chose for the Grape Jam border, so I ordered fabric that was from the Maypole fabric line and cut that up, it just needs to be sewn on.  Hubby is on shutdown for two weeks so I'm not expecting too much sewing time while he's off.

Two "B" blocks for Judy's Memorial Day QOV are complete, along with all of the "A" blocks.


The rows of more "B" blocks are ready to be sewn together.


Here are my numbers:

~ Fabric Used this Week: 2.75 yards
~ Fabric Used YTD:  61.50 yards

~ Fabric Added this Week: 1.50 yards
~ Fabric Added YTD: 35.75 yards

~ Net Usage: +25.75 yards

Mid-Year Report

Comparison of last year's mid-year numbers:

2010 Used:  61.50 yards
2009 Used:  108 yards

2010 Added:  35.75 yards
2009 Added:  84.50 yards

I'm a little behind with usage, but I'm on track to at least use up 100 yards for the year.  I have been doing pretty good on not adding fabric, but I did poke some buttons this week.  I ordered some red, white and blue wide backing fabrics to make more QOV tops and a BOM backing.  There are also some fabric collections that will be coming out this fall that I've got my eye on.  I was able to move some of the fabric from under the sewing table into the closet, so progress is being made. 

Go to Judy’s blog and see how others did with their stashbusting this week.

Goals for the Week:

~ Work on Morning Splash border #3
~ Sew border on Grape Jam
~ Knit last 2-3 inches of Melbourne sweater front
~ Complete Memorial Day QOV "B" blocks